Our group of managers toasting the start of the new greenhouse.
(left to right)
Sham, Byron, me and Margaret sipping on sparkling lemonade.
The empty back lot at Logee's.
A total of 72 holes for the steel poles being dug.
The first of many tractor trailer trucks backing down the narrow pathways.
It's a tight fit maneuvering between our freestanding greenhouses.
Unloading the poles between the plants.
Poles standing tall
Green foam board hand placed for the radiant heat.
Tubing which will carry hot water for heating purposes.
Byron taking a break for a picture, Corey kneeling and Dave Papuga organizing the project during the heat wave.
A sea of green.
The concrete has been poured over the green foam.
Another Truck loaded with the polycarbonate for the roof.
The truck was carefully unloaded by hand.
Each sheet was in good shape.
More Steel arrives.
Trusses are being built by the construction crew.
Trusses secured on the base structure.
Byron and John Wells from Rimol Greenhouses.
Deciding where to put an interior sliding door.
The polycarbonate roof is carefully going on the 4 bays.
The new greenhouse from afar.